Introduction

AS9102 Rev B First Article Inspection (FAI) is a mandatory aerospace requirement used to validate manufacturing processes before full-scale production.

In India, many aerospace suppliers fail audits not because of product defects, but due to incorrect or incomplete FAI documentation. A properly executed FAI ensures traceability, compliance with AS9100 standards, and customer approval without delays.

AS9102 Rev B First Article Inspection process

What is AS9102 Rev B First Article Inspection (FAI)?

AS9102 Rev B First Article Inspection (FAI) is a formal and documented verification that confirms:

✔ Product meets all engineering requirements
✔ Manufacturing process is capable
✔ Materials and processes are compliant

FAI is performed on the first production part using actual production conditions.Learn more about quality services:
https://www.qopikun.com/

FAI vs Other Inspections

FAI is often misunderstood. It is not:

  • First piece inspection
  • Routine inspection
  • Incoming inspection

FAI is a customer-required validation activity linked to part number, design, and process.

The 3 Mandatory Forms in AS9102 Rev B

Form 1: Part Number Accountability

Includes:

  • Part number and revision
  • Drawing reference
  • Organization details
  • FAI reason

Form 2: Product Accountability

Includes:

  • Material certificates
  • Special process approvals
  • Supplier details
  • Test results

Form 3: Characteristic Accountability

Includes:

When is FAI Required?

FAI is required in the following cases:

✔ New part production
✔ Drawing revision changes
✔ Process or tooling changes
✔ Change in manufacturing location
✔ Supplier or material changes
✔ Long production gap

Missing these triggers can result in major audit nonconformities.

Balloon Drawing – Critical Requirement

The balloon drawing links every requirement to inspection results.

Common mistakes:

❌ Missing characteristics
❌ Non-sequential numbering
❌ Ignoring notes or tolerances

✔ Every requirement must be included:

  • Dimensions
  • GD&T
  • Notes
  • Material specs
  • Surface finish

Critical Form 3 Mistake

A major mistake in FAI documentation:

❌ Writing “PASS” or “OK”

✔ Correct approach:

  • Always record actual measured values
  • Use traceable references where required

This ensures traceability and audit acceptance.

Top Reasons FAI Gets Rejected

  • Missing characteristics in balloon drawing
  • Incorrect Form 3 entries
  • Wrong drawing revision
  • Missing material records
  • Unapproved suppliers
  • No key characteristic identification
  • Expired calibration
  • Missing tolerance references

Improve measurement accuracy:
https://www.qopikun.com/service/cmm-inspection-services/

Why Choose Qopikun?

✔ Experience in aerospace quality systems
✔ Expertise in AS9102 documentation
✔ Support for audit readiness
✔ Trusted by manufacturing companies across India

Complete FAI Package Checklist

✔ Form 1, Form 2, Form 3
✔ Ballooned drawing
✔ Material certificates
✔ Process approvals
✔ Inspection reports
✔ Calibration records

Importance of FAI for Aerospace Suppliers

A strong FAI process helps organizations:

✔ Improve audit success
✔ Reduce rejection rates
✔ Build customer confidence
✔ Ensure consistent production quality

FAI plays a key role in achieving aerospace quality certification in India.

Challenges Faced by Aerospace Suppliers in India

Many suppliers struggle with:

✔ Understanding AS9102 documentation requirements
✔ Creating correct balloon drawings
✔ Maintaining traceability in Form 3
✔ Managing supplier approvals and material certificates

These challenges often lead to audit failures and customer rejections.

Best Practices for AS9102 Rev B FAI

✔ Balloon all characteristics
✔ Record actual values (no PASS/OK)
✔ Use latest drawing revision
✔ Verify supplier approvals
✔ Ensure calibration validity

How Qopikun Global Services Supports You

Qopikun Global Services Pvt. Ltd. supports aerospace suppliers with:

  • FAI documentation support
  • Balloon drawing preparation
  • Inspection and validation
  • Quality system improvement
  • Audit preparation assistance

Explore services:
https://www.qopikun.com/

Frequently Asked Questions (FAQs)

Q1. Is AS9102 Rev B still valid?
Yes, but many organizations are moving to Rev C depending on customer requirements.

Q2. What happens if FAI is not performed?
It can result in audit nonconformities, customer rejection, and production delays.

Q3. Can FAI be partial?
Yes, partial FAI is allowed in case of changes in design, process, or supplier.

Q4. Who prepares FAI documents?
Typically, quality engineers or third-party inspection providers.

Conclusion

AS9102 Rev B First Article Inspection is not just documentation — it is proof of process capability.

Organizations that implement FAI correctly:

✔ Achieve faster approvals
✔ Reduce errors and rework
✔ Improve product quality
✔ Strengthen aerospace compliance

Contact Information

Connect with Qopikun Global Services Pvt Ltd to reduce quality risks, achieve right-first-time approvals, and build strong inspection capability.

Qopikun Global Services Pvt. Ltd.
📍 Serving clients across India and globally
📧 Email: admin@qopikun.com
📞 Phone: +91-9964517976
🌐 Website: https://www.qopikun.com

Previous Post
Newer Post

Leave A Comment

At vero eos et accusamus et iusto odio digni goikussimos ducimus qui to bonfo blanditiis praese. Ntium voluum deleniti atque.

Melbourne, Australia
(Sat - Thursday)
(10am - 05 pm)